top of page
demo before.jpg
Site of Old Church Building
Day of Demolition
May 23, 2026

New Building Progress

Follow the progress of the new building construction here.

historical entry.jpg

1903 Main Entrance

This was the original entrance to the building when it was built in 1903.

Sanctuary.jpg

Inside the Santuary

This was the sanctuary right before the demolition.  The arched stained glass window was taken out in order to be restored and included in the new sanctuary.  Unfortunately only the major portion of the window will be able to be used in the new building.

Stained Glass 1.jpg

Altar Stained Glass Windows

These stained glass windows in the altar area of the sanctuary will be used in the new building in the same way.  They will be installed in the altar area of the new sanctuary.

Sanctuary core.jpg

Inside the Sanctuary - 02/2026

This was the sanctuary at the end of February 2026 before the demolition.  The arched stained glass window was removed in order to be restored and included in the new sanctuary. 

Stained Glass 2.jpg

Other Stained Glass Windows

The hope is to restore and be able to install some of the original stained glass windows in the new building in such places as a prayer room and other significant areas of the new building as memorials

Demo 06.7.2026.jpg

Demolition Site 06/07/2026

This is a picture of the demolition site on Sunday, June 7 as debris was being taken away.  This will be the site of the new building.